CRACK CONTROL TECHNOLOGY FOR THE OVERALL FLOOR OF AN ULTRA-LONG AND LARGE EXHIBITION HALL
Keywords:
Large-area flooring, Cracks, Construction, Exhibition hallAbstract
Construction cracks are prone to occur in the construction of large-area flooring, which affects the integrity, aesthetics and quality of the flooring. How to better control construction cracks has become an important issue that construction units must consider. This article will analyze the specific causes and control techniques of construction cracks in large-area flooring of buildings based on actual conditions, in order to provide reference and reference for related construction operations.References
[1] Gan Haitao. Crack control technology for large-area floor construction. China Building Metal Structure, 2023(09):35-37.
[2] Li Zuquan. Study on the influence of concrete mix ratio on the crack resistance of bridges and its mechanism. Civil Engineering, 2024(06):29-31.
[3] Zheng Yongsheng. Application of skipping method in the construction of 300 m long and large-volume concrete basements. Construction Technology Development Engineering Technology, 2022(11):112-115.
[4] Zhang Yongfu. Crack control of diamond wear-resistant floor. Sichuan Construction, 2023(09):106-108.
Downloads
Published
2024-01-01
How to Cite
Sun, W., Zhang, X., Luo, X., Bai, Z., Zhang, Z. (2024). Crack Control Technology For The Overall Floor Of An Ultra-Long And Large Exhibition Hall. Eurasia Journal of Science and Technology, 2(2), 20-22. https://doi.org/10.61784/wjer3002