INTERCONNECTION DESIGN EQUIPMENT REQUIREMENT FOR IPPS IN PAKISTAN
Volume 6, Issue 3, Pp 13-19, 2024
DOI: 10.61784/jcsee3010
Author(s)
Muhammad Farooq1*, Haseeb Khalid2
Affiliation(s)
1Department of Computer Sciences and Information Technology, Superior University Lahore, Pakistan.
2Power China HDEC, Beijing 100037, China.
Corresponding Author
Muhammad Farooq
ABSTRACT
In Pakistan, electrical energy is produced from a variety of sources, and the government is currently planning to combine renewable energy sources to provide end users with cheaper electricity. This would support Pakistan's manufacturing sector and may also result in more exports, which will reduce Pakistan's import-export imbalance and boost total reserves, which are now being depleted from the country's overall economy. These renewable energy projects have created new business opportunities in Pakistan, where investors are urged to become independent power producers (IPPs) and generate electricity using standardized technologies for both producing and selling electricity. Understanding the processes that IPPs must take in order to install a Power Plant is the goal of this publication. This paper will assist IPP investors in making better plans and managing projects within the allotted time frames and budgets. Additionally, it will provide an overall standard checklist for IEC or NTDC to choose better equipment and designs to run their plant more effectively.
KEYWORDS
NTDC (National Transmission and Dispatch company); IEC (International Electro technical Commission); IPP (Independent Power Producers); PSP (Planning section of power system); MW (Mega Watt); MOU (Memorandum of understanding); EOI (Expression of Interest); NEPRA (National Electric Power Regulatory Authority)
CITE THIS PAPER
Muhammad Farooq, Haseeb Khalid. Interconnection design equipment requirement for IPPs in Pakistan. Journal of Computer Science and Electrical Engineering. 2024, 6(3): 13-19. DOI: 10.61784/jcsee3010.
REFERENCES
[1] National Transmission & Despatch Company Limited (NTDC). "Power System Statistics 47th Edition December 2022." Report, 2022. Available at: https://es.scribd.com/document/709410151/47th-Edition-Final-Version.
[2] National Electric Power Regulatory Authority (NEPRA). "State of Industry Report 2022." NEPRA Report, 2022. Available at: https://nepra.org.pk/publications/State%20of%20Industry%20Reports.php.
[3] National Transmission & Despatch Company (NTDC). "Official Website." NTDC, 2024. Available at: https://ntdc.gov.pk/.
[4] Tribune Express. "Official Website." Tribune Express, 2024. Available at: https://www.tribuneexpress.com/.
[5] Saur Energy. "Official Website." Saur Energy, 2024. Available at: https://www.saurenergy.com/.
[6] Central Power Purchasing Agency (CPPA-G). "Official Website." CPPA-G, 2024. Available at: https://www.cppa.gov.pk/.
[7] Muhammad Amir Raza, Muhammad Mohsin Aman, Abdul Ghani Abro, et al. Challenges and potentials of implementing a smart grid for Pakistan’s electric network, Energy Strategy Reviews, 2022, 43, 100941. DOI: https://doi.org/10.1016/j.esr.2022.100941. https://www.sciencedirect.com/science/article/pii/S2211467X22001353
[8] PITCO Pakistan. "Projects." PITCO Pakistan. Accessed August 9, 2024. https://www.pitcopk.com/projects.
Dunnan, Liu, Gul, Rana, Jaffri, Nasif, et al. Independent Power Producer (IPPs) of Pakistan and CSR to Enhance Performance. 2020. 1-5. DOI: 10.1109/iCoMET48670.2020.9073918.