DISCUSSION ON THE PROBLEMS AND SOLUTIONS OF CONSTRUCTION PROGRESS MANAGEMENT
Volume 6, Issue 6, Pp 67-73, 2024
DOI: https://doi.org/10.61784/ejst3049
Author(s)
ZeYu Guo, WenBo Wang*, ChenRui Liu, Song He
Affiliation(s)
College of Management Science and Engineering, Beijing Information Science and Technology University, Beijing 1000192, China.
Corresponding Author
WenBo Wang
ABSTRACT
In today's Chinese market, the scale of construction projects is expanding, construction enterprises are growing, and construction enterprises are facing increasingly fierce market competition in the construction process. In this market environment, if enterprises want to maintain their advantages in the market, they must improve their own management level. Only by completing the required construction schedule on time and with high quality can construction enterprises occupy a dominant position in the market competition. Whether the construction progress of the construction project can be completed on schedule directly reflects the project management level of the construction enterprise. Through the investigation of construction progress management, there are still major problems such as unreasonable construction schedule, inadequate construction organization and implementation, imperfect management of construction equipment, insufficient guarantee of construction funds, and low technical ability of construction personnel.
KEYWORDS
Construction engineering; Construction progress; Schedule management; Project management
CITE THIS PAPER
ZeYu Guo, WenBo Wang, ChenRui Liu, Song He. Discussion on the problems and solutions of construction progress management. Eurasia Journal of Science and Technology. 2024, 6(6): 67-73. DOI: https://doi.org/10.61784/ejst3049.
REFERENCES
[1] Zhang Xiaoyan. Effective measures to strengthen the progress management in the construction project management. Green and environmental protection building materials, 2021 (09): 173-174.
[2] Huang Kepeng. Analysis of progress management in construction project management in the new era. Guangzhou Architecture, 2022, 50 (06): 77-80.
[3] Guo Shuai. On the importance of progress management in construction project management. Building Materials Development Orientation, 2024, 22(17): 8486. DOI: 10.16673/j.cnki.jcfzdx.2024.0587.
[4] Yan Jianming, Xie Jianfeng. Construction progress management of construction engineering. Sichuan Building Materials, 2022, 48 (07): 174-175+193.
[5] Zhu Haiyang. An effective path to strengthen progress management in construction project management. Theoretical Research on Urban Construction (electronic version), 2023 (02): 17-19.
[6] Li Shimin. Problems and optimization strategies in progress management. Real Estate World, 2022 (09): 128-130.
[7] Guo Shuai. Building Materials Development Direction, 2024, 22(19): 83-85. DOI: 10.16673/j.cnki.jcfzdx.2024.0692.
[8] Zhang Shuting. Application of fine management in project progress management. China Management Informatization, 2024, 27(20): 67-69.
[9] Yang Tao. Research on highway construction quality and schedule management. Transportation World, 2023 (Z2): 287-289.
[10] Yan Lei. Construction progress control and management of civil works. Ceramic, 2023(05): 115-117+127. DOI:10.19397/j.cnki.ceramics.
[11] Xie Yan. Research on progress management optimization of complex highway overhaul project: A case study of a national highway overhaul project in Sichuan Province. Sichuan Architecture, 2024, 44(05): 315-316+320.